In recent times, Thermal-Tech has started work on the Snodland Project in the UK.
We have commissioned the installation of the support structure, the installation of mineral wool insulation from 120 mm to 360 mm thickness, the preparation of protective coat and its assembly, on two boilers of VKK Standardkessel.
The scope of work given to our company covers about 1250 m2.
For the above mentioned project, we still have insulation of four tanks with a total area of 260 m2.
.