Thermal-Tech company has completed the first stage of insulation work for the project “Construction of Power Blocks no. 5 and 6 in PGE GiEK SA Branch of Opole Power Plant” for Mostostal Power Development.

The works included the implementation of complete insulation of heating pipelines in the boiler buildings of block no. 5. Thermal-Tech has provided a complete set of materials to perform the aforementioned task.
Our work was to install thermal insulation, which consisted of Paroc Hvac Section AluCoat and mineral wool 30 mm thick. We have made, supplied and installed a complete protective coat made of galvanized sheet.
For flanged connections, valves and disassembled hoods, filled with mineral wool insulation of 30 mm thick.
Installation of thermal insulation on the boiler pipelines of block no. 5 amounted to over 1100 meters. The surface of the insulation is about 800 m2.